WHY INVEST IN INTERMITTENT BONDED RIBBON?

Intermittent Bonded Ribbon Production Line Available For Sale

A specified speed of 600 m/min gives this equipment considerable production capacity for optical-fiber applications. Before making purchasing plans, buyers should verify the actual speed, configuration, and operating conditions with the manufacturer.

Shanghai Weiye OFC provides a system engineered to manufacture 12- and 16-fiber rollable ribbons. Its product description presents the equipment’s capabilities, technical specifications, and included systems, providing U.S. buyers with a basis for comparing their equipment requirements.

Review the listed configuration in the product description, then contact the supplier about pricing, installation, and options specific to your project. This approach helps determine which equipment details apply to your particular manufacturing site and goals.

The listed address for Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. is 201 Minyi Road, Songjiang District, Shanghai. Consider the product listing a preliminary information source, and confirm up-to-date specifications and commercial terms with the supplier. Submitting a clear request for pricing and specifications can help you move forward with the assessment.




Key Takeaways

  • A speed of 600 m/min is listed, but buyers should verify the operating conditions with the manufacturer.
  • The machinery is intended to manufacture rollable ribbons containing 12 or 16 fibers.
  • The product listing describes machine capabilities, technical specifications, and supplied systems.
  • Ask the supplier to clarify costs, installation arrangements, and requirements unique to your project.
  • A company address in Shanghai’s Songjiang District is included in the supplier information.

Intermittent Bonded Ribbon Production Line Overview

According to the supplier, the equipment is designed for rollable IBR configurations containing 12 or 16 fibers. The published specifications state a 600 m/min construction speed together with a fiber diameter of Ф245 μm ±10 μm. Because these figures represent stated machine specifications, buyers should verify achievable speeds and operating conditions with the manufacturer.

Intermittent Bonded Ribbon Production LineIntermittent Bonded Ribbon Production Line

Designed To Produce Twelve- And Sixteen-Fiber Rollable Ribbons

The machine configuration accommodates two different fiber counts in rollable ribbon designs. This provides a useful reference when buyers compare machinery against their required ribbon format, fiber dimensions, and material-handling arrangements.

How Intermittent Adhesive Bonding Allows Flexible Fiber Configurations

The patent’s design examples describe neighboring fiber subunits joined by adhesive bonds positioned at intervals. The patent provides an example of adhesive-bond intervals ranging between 10 mm and 1,000 mm. Unlike continuous bonding, this arrangement does not join the fibers along their entire length.

These intermittent adhesive connections allow the assembly to change from a relatively flat configuration into rolled, curled, or folded forms. The specified spacing illustrates the patented design concept rather than confirmed production-machine settings.

  • Machine details: 12 or 16 fibers, a stated speed of 600 m/min, and a diameter of Ф245 μm ±10 μm.
  • Patent example: Adhesive-bond intervals ranging from 10 mm to 1,000 mm.
  • Design benefit: Adaptable handling when the ribbon takes different shapes.

Applications In Optical Fiber Cable Manufacturing

Adjustable fiber layouts may allow cable designers to combine convenient splice access with space-efficient packaging. The patented design keeps fibers arranged in order while permitting sections between bonded points to shift as the cable is assembled.

Compact Cable Designs And High Fiber Density

An optical fiber ribbon may remain flat during mass fusion splicing and subsequently fold or roll for installation in a smaller cable. Potential advantages described in the patent include smaller cable constructions and an increased ratio of fiber area to overall cable cross-sectional area. The results achieved in practice depend on the complete cable construction and its intended use.

Ribbon Organization For Efficient Fusion Splicing

The ribbon format enables organized handling at the splice location while allowing the subunits to move during cable assembly. The manufacturer’s material-handling specifications identify payoff reel capacities of 25.2 km and 50.4 km of fiber. These reel capacities can be compared with the facility’s cable-manufacturing needs and material-handling setup.

Design detail Possible application Consideration for buyers
Flat fiber configuration Fusion splicing of multiple fibers Confirm requirements for the splice workflow
Folded or rolled format Compact cable packaging Review the overall cable construction
Payoff reels with capacities of 25.2 km and 50.4 km Planning material-handling operations Align reel capacities with operating needs

Specifications And Performance Of The Production Line

Before asking for pricing, assess whether the stated machine performance matches the demands of your production process. Installation preparations should also account for suitable reels and the utilities available at the production site.

Production Speed, Fiber Diameter, And Attenuation

According to the specifications, the construction speed reaches 600 m/min. The listed fiber diameter is Ф245 μm ±10 μm, with additional attenuation of ≤0.01 dB/km measured at 1550 nm. Confirm the measurement conditions and expected performance directly with the manufacturer.

Compatibility With Payoff And Take-Up Reels

The payoff system accommodates two reel dimensions, and the maximum weight of a full reel is 10 kg. For take-up, the equipment accepts either a T-type reel or a fiber-optic reel. Check whether the preferred reel format suits your existing handling equipment and procedures.

Facility Utilities And Operating Environment

Plan for a 380 V ±10% power connection using a three-phase, five-wire system. The equipment should operate in an enclosed, clean, dry, draft-free area maintained at 15 to 25°C and a maximum relative humidity of 85%. Utility requirements also include nitrogen at 7 bar and 99.99% purity, plus a compressed-air supply at 6 bar. Check all utility connections in advance of installing the equipment.

Specification Listed requirement Planning note
Reels for fiber payoff Ф236 × Ф25.4 × 108 mm; Ф267 × Ф25.4 × 180 mm; maximum full-reel weight ≤10 kg Check reel compatibility and maximum weight
Reel used for take-up T-type dimensions of Φ410 × Φ50.8 × 391 mm, or a fiber-optic reel Confirm compatibility with your selected format
Electrical and environmental requirements Power supply of 380 V ±10%; temperature of 15 to 25°C; humidity ≤85% Provide a clean, dry area without drafts
Gas utility supply Nitrogen: 7 bar, 99.99% purity; air: 6 bar Verify gas supply capacity before installation

Fiber Payoff And Gathering Equipment

The payoff and gathering assemblies direct optical fibers into the ribbon-forming area. The associated controls help maintain a steady supply of fiber while reducing handling risks.

Tension-Controlled Payoff System For Sixteen Spools

The payoff assembly holds 16 spools and provides traversing along with separately adjustable tension settings. Each spool has a maximum weight capacity of 10 kg. Detailed specifications indicate a tension range of 0.4 to 2 N, accuracy of ±0.02 N, and a 550 W motor. Another overview gives a range of 40 to 150 g and accuracy of ±2 g, so buyers should confirm which specification applies to their configuration.

Fiber Guiding, Break Detection, And Electrostatic Control

U-groove guides, multi-groove gathering rollers, and anti-jump components channel fibers into the forming section. Operators receive alerts about fiber problems through break detection and alarm functions. Safe handling is supported by protective guards and a pneumatic clamping mechanism. At the fiber exit, a rod-style electrostatic dust collector is installed, while anti-static equipment helps manage dust along the gathering route.

Component Specified details Intended function
Fiber payoff assembly Capacity for 16 spools, each weighing up to 10 kg Supplies fibers using traversing
Tension and motor 0.4 to 2 N with ±0.02 N accuracy; 550 W Supports regulated payoff of fibers
Fiber guidance and safety features Grooved rollers, alarms, guards, and pneumatic clamping Guides fiber movement and assists material handling
Electrostatic management Rod-type dust collector and anti-static equipment Helps reduce dust near fiber routes

Intermittent Adhesive Dispensing And Precision Molding

The ribbon-forming platform allows operators to control the mold position and placement of adhesive. These settings allow the production process to be adapted to the intended ribbon configuration.

Ribbon Formation Using An Adjustable IBR Mold Platform

Three mold sets are provided for ribbon formation, and each accommodates as many as five Nordson EFD jet valves. Operators can position the mold within 0 to 15 mm and adjust its base temperature from 20°C to 60°C. Precision valve groups mounted on sliding tables allow fine positioning and accurate application of adhesive dots.

Adjustable Nozzle Configurations For Twelve- And Sixteen-Fiber Ribbon Production

The 12-fiber configuration employs a 5+5+1 valve arrangement. Production of the 16-fiber format uses a 5+5+5 configuration. The control interface enables changes to dot count and spacing according to the ribbon configuration being manufactured. The process calls for a specialized adhesive suitable for both coating and curing.

Process setting Format With 12 Fibers Format With 16 Fibers
Dispensing valve layout 5+5+1 valve configuration 5+5+5 valve configuration
Mold positioning range Adjustment range of 0 to 15 mm Adjustment range of 0 to 15 mm
Temperature of the mold base 20°C to 60°C operating range Temperature range of 20°C to 60°C

UV-LED Curing For Bonded Fiber Ribbons

The curing assembly applies UV exposure in stages to harden adhesive throughout the fiber structure. The arrangement of the ovens and their published operating values provide buyers with information for evaluating process compatibility.

Pre-Curing And Main Curing Stages

Three dedicated LED-UV ovens rated at 800 W each perform the pre-curing operation. Fibers from each mold group pass through their respective pre-curing unit before entering the principal 6 kW post-curing oven. The system uses adjustable shutters to help contain UV exposure and minimize nitrogen losses. The supplier states a principal wavelength of 395 nm ±3 nm, minimum curing degree of 85%, and post-curing power of no less than 2.5 kW.

Managing Nitrogen Supply And Curing Performance

Operators can manually regulate nitrogen pressure and flow. The system additionally switches nitrogen on when starting and off when shutting down. The manufacturer states that lamp-array power use remains at or below 80% of total power during steady, continuous operation at production speed. The figures are useful for initial equipment assessment, but buyers should confirm the conditions under which they were measured. Discuss how the operating settings may change depending on the adhesive and materials selected.

Visual Monitoring, Capstan, And Take-Up

Visual inspection and consistent winding help preserve fiber quality as material passes through the production line. The published operating settings also offer buyers useful criteria for comparing equipment against their cable production requirements.

Online Inspection Of Fiber Color Sequence And Adhesive Dots

A microscope and camera provide enlarged images in real time. Operators can inspect optical-fiber color order and verify the presence of resin dots at individual dispensing locations. This inspection helps identify ribbon problems before the material enters the winding stage.

Precision Take-Up With Servo-Controlled Traction

The Φ190 mm capstan traction wheel is driven by a 1 kW AC servo motor. Metering accuracy is specified as better than 1‰. Operators can set tension between 50 and 500 g while maintaining an accuracy of ±5 g. These operating parameters help maintain careful fiber-ribbon handling as the material advances through the line.

Take-up operation is rated at 600 m/min with a spool weight limit of 30 kg. The servo-driven take-up and traversing assemblies support uniform positioning during winding. The cable pitch setting allows continuous adjustment from 1 to 6 mm. Position detection and direction changes are supported by a photoelectric sensor. Check the intended cable requirements and actual operating conditions with the manufacturer.

Electrical Controls And Production Monitoring

Clear control functions help production staff manage settings, monitor system conditions, and prepare smooth stopping procedures. According to the manufacturer, the machinery incorporates Siemens controls alongside Schneider Electric switchgear.

PLC And Touchscreen Operation

Siemens S7-1200 and S7-1500 PLCs manage the ribbon manufacturing system through a 10.4-inch Siemens touchscreen. Schneider Electric provides the low-voltage switching equipment. The system supports both interlocked operation across the full production line and separate operation of individual units.

Settings, Alarms, And Length-Based Stops

The touchscreen allows adjustment of process parameters, curing-oven activation, wire-feed settings, and alarm information. It also displays lamp operating hours, live lamp current, oven temperature, and the equipment’s accumulated operating time. A meter-counter correction function helps synchronize displayed length measurements with actual material movement.

Operators can program a target production length that triggers deceleration or shutdown. This provides a practical way to control the end of a cable production run. Verify the available controls and configuration requirements with the supplier before purchasing.

Control-system feature Listed detail Practical function
PLC and display Siemens S7-1200/S7-1500; 10.4-inch touchscreen Adjust and review operating information
Electrical components Schneider Electric low-voltage switchgear Supports electrical control operations
Monitoring and stopping Operating data for lamps, ovens, runtime, and meters; preset-length function Track operating conditions and initiate machine stopping or slowing

Ribbon Quality, Material Selection, And Process Compatibility

Adhesive selection affects both the consistency of coating application and the final product. Rather than recommending a general adhesive, the supplier specifies a formulation dedicated to the equipment’s coating and curing operations.

Specialized Adhesive Used For Bonding And Curing

The pressure-fed adhesive system provides independent valve switches so each supply path can be opened or closed as required. Precision pressure-regulating valves help maintain controlled adhesive delivery at each dispensing location. The specified air pressure is adjustable, with a required minimum of 0.5 MPa.

The adhesive lines are black to reduce the risk of UV-triggered reactions while the system operates and cures material. This protection is important because premature exposure may change adhesive properties before application to the fiber.

Confirm suitable adhesives, process parameters, and surface-finish requirements with the manufacturer before choosing materials for a secondary coating operation. Ask how the recommended adhesive performs under your intended application conditions and expected production length. Clear process instructions can help maintain quality from initial setup through final production.

Equipment Installation Needs And Supplied Documentation

Prepare the installation area and necessary utility connections before arranging equipment setup. The manufacturer’s stated requirements help buyers prepare their facilities and maintain stable operation of the optical fiber equipment.

Facility Conditions And Buyer-Supplied Connections

The machine should be positioned inside a draft-free, enclosed workspace that is clean and dry. Maintain a room temperature of 15 to 25°C and relative humidity no higher than 85%. The installation also requires nitrogen supplied at 7 bar with 99.99% purity and an air supply rated at 6 bar.

The equipment package does not include connecting cables or cable trays. The purchaser is responsible for supplying the main incoming power cable. Verify the available utilities and planned cable routes ahead of setup, especially if a secondary coating section is nearby.

Documentation For Operation, Installation, And Maintenance

Documents covering installation, equipment use, and maintenance are provided by the manufacturer. Inspect the supplied documentation before commissioning so personnel can organize tasks and obtain required materials.

  • Operating and instruction manuals together with the overall equipment layout drawing
  • Electrical schematics, wiring diagrams, and drawings for installation and maintenance
  • Purchased-component instructions and a wear-parts list to support service preparation

The supplied records support preparation for commissioning and routine servicing of the cable production machinery.

Selecting A Ribbon Production Line That Matches Your Manufacturing Requirements

Begin by identifying the ribbon formats you intend to manufacture and sell. The machinery supports 12F and 16F formats and has a stated construction speed of 600 m/min. Assess the stated capabilities against your planned range of products, throughput requirements, and projected cable orders.

Verify take-up reel compatibility before placing an equipment order. The standard IBR reel has dimensions of Φ410 × Φ50.8 × 390 × Φ310 mm, supports up to 30 kg, and provides cable pitch adjustment from 1 to 6 mm. Check that these specifications suit your production facility and material-handling operations.

Payoff reel compatibility also deserves attention. Available options include international-standard spools accommodating 25.2 km, 50.4 km, and 63 km. Request precise reel measurements before selecting materials or determining production run lengths.

Evaluate utilities, adhesive requirements, and operator-monitoring capabilities alongside production speed. Assess whether the equipment arrangement is appropriate for fiber cable, loose tube, or the specific application in your cable production process. Before ordering, review equipment configuration and startup requirements directly with Shanghai Weiye. Checking equipment suitability in advance can reduce the likelihood of costly changes after purchase.

Production planning consideration Listed detail Required buyer verification
Ribbon configurations and operating speed 12F and 16F formats; 600 m/min Match the specifications to manufacturing goals and product range
Take-up 30 kg maximum capacity; adjustable pitch from 1 to 6 mm Check reel compatibility and facility requirements
Fiber payoff reel options 25.2 km, 50.4 km, and 63 km spool capacities Verify exact spool dimensions

Request A Quote For The Intermittent Bonded Ribbon Production Line

For U.S. manufacturers, the equipment provides 12F and 16F configurations, a listed construction speed of 600 m/min, and dedicated machinery for forming optical fiber ribbons. Compare these features with your planned cable products to assess equipment suitability.

A pricing inquiry should include your chosen format, projected production quantity, reel requirements, and facility utility details. Include information about the fibers and material-handling process to allow Shanghai Weiye to review the intended setup.

Before ordering, verify adhesive compatibility, the specified LED wavelength of 395 nm ±3 nm, and the published curing performance. Discuss how the stated specifications affect your intended material and finished surface-quality objectives.

Consult the product page for the published equipment description. Verify the final configuration, shipment details, and installation commissioning with Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. The company’s listed address is 201 Minyi Road, Songjiang District, Shanghai. Telephone 021-60701630 to discuss your manufacturing requirements. Providing complete information in your quote request makes the following stages easier to clarify.